STANDARD EQUIPMENT
30 Tools double arm ATC
Built-in dual (internal) screw conveyors
Coolant bed flush
Thru the spindle coolant at 290 psi
1,000 psi coolant prep
Oil skimmer
4th Axis interface prep kit
Renishaw probe ready kit (OMI-2T)
Rigid tapping
Programmable and data protection key switch
Machine work light: LED LAMP
Coolant system with separate coolant tank (tank capacity: 86 gal.)
Telescopic way covers
Full enclosure splash guard
Spindle load meter
Lubrication system
Portable manual pulse generator
Leveling tools
Transportation parts
Machine Manuals: one (1) each (Electric Diagram, Maintenance, Parts List, Operation /Maintenance)
Fanuc Manuals: one (1) each (Manual Guide i, Operations, Parameter, Maintenance, Operators volumes 1 and 2) in USB
We use cookies to improve your experience. Privacy Policy.